EPC schedules have no slack. Project freight is planned backwards from the commissioning date, not forwards from the factory gate.

Break-bulk · MPV · flat rack · ODC roadStart before fabrication completesTransformers, towers, turbines, modulesPermit lead times, not transit times
The sector

Project and EPC cargo for large builds.

Infrastructure and EPC cargo is the most demanding freight there is: transformers, towers, turbines, boilers and modules that are oversized, irreplaceable within the schedule, and destined for sites that may have no crane and no proper road.

Everything depends on planning done before fabrication finishes. Route surveys, permits, lifting plans and vessel selection all have lead times measured in weeks, and they — not the factory — usually set the critical path.

Cargo we move for this sector

  • Power transformers and switchgear
  • Transmission towers and structures
  • Turbines, boilers and pressure vessels
  • Pre-assembled process modules
  • Construction plant and heavy equipment
What makes it hard

The problems worth solving

The schedule is fixed at the far end

Site erection windows and commissioning dates cannot move, so every upstream delay compounds.

Permits take longer than transport

ODC permissions, escorts and utility clearances routinely take longer than the journey itself.

Sites without infrastructure

Many project destinations have no heavy crane and limited road access, which decides the vessel and equipment months earlier.

Sequencing matters

Pieces must arrive in the order the site can erect them, not the order they were manufactured.

How we help

What we do differently here

  1. 01
    Route surveys before fabrication

    Physical inspection of bridges, radii and clearances early enough to influence how the piece is built.

  2. 02
    Permits driven to issue

    ODC permits, state approvals and escorts applied for and tracked, not just requested.

  3. 03
    Engineered lifting and stowage

    Lifting plans, rigging arrangements and stowage approved, with marine warranty survey where value warrants.

  4. 04
    Deliveries sequenced to erection

    Shipments planned against the site programme, with storage arranged where the site is not yet ready.

FAQ

Infrastructure & Projects, answered

Before fabrication is complete, ideally at design stage. Route constraints can influence how a piece is built, and that option disappears once it is welded.

We do — permits, state approvals, utility clearances and police escorts, tracked through to issue as part of the scope.

We arrange bonded or open storage near site and resequence deliveries. Telling us early is always cheaper than arranging storage in a hurry.

Yes. We route via geared vessels and bring mobile lifting to site where required, planned as part of the move rather than found later.

Per project, after a survey. There are too many variables — route, permits, equipment, lifts, vessel space — for a rate card to be honest.

Infrastructure & Projects

Your sector, our lanes

Tell us what moves and where it goes. We'll bring the equipment, the paperwork and the schedule that fit.